Test where PIR step lights switch on, how long they stay on and which lights activate together. Send your stair plan to confirm a sample before ordering.

A PIR step light can switch on exactly as designed and still switch on too late for a hotel staircase. Before placing a bulk order, install the sample at the proposed height and mark the point by which the tread needs to be lit. Then walk the actual approach. If the light only comes on after you reach that point, the sample has not met the project's requirement, even if it detects movement within the quoted range.
Where should the light switch on?
Start at the upper landing. Where does a guest first need to see the next tread when walking down? Mark that point on the stair plan or with removable tape. Do the same at the bottom of the flight and where guests turn in from a corridor. These are the points to use for approval, not the outer edge of a sensor range shown on a datasheet.
Take a half-landing as an example. A sample may switch on early when someone walks straight towards it from the bottom, yet switch on only after someone turns and starts down the next flight. Both approaches trigger the same fitting, but only one may meet the project's requirement. A bench test would miss that difference.
How do you test the sample without guessing the detection boundary?
Mount the sample at the proposed height and orientation, using a wall section or mock-up that represents the finished installation. Fit the specified faceplate fully and check that it does not obstruct the sensor window. Keep the normal staircase lighting available during the test; the step lights are not a substitute for required general or emergency lighting.
Walk towards the fitting, pass across its front, go up and down the stairs, and enter from the turn or landing. Start each run from a marked point and let the fitting return to its normal idle state between runs. Record where you were when the light first came on. If the team also wants a response-time record, film the marked approach and the fitting together, then measure from the marked point to switch-on. That gives you a repeatable site comparison without pretending you know exactly when the sensor first detected movement.
Repeat any route that gives an inconsistent result. Walk past the stair entrance without entering it as well. A fitting that lights early for an approaching guest may still be a poor fit if ordinary corridor traffic activates it when the project team wants the staircase lights to stay off.
What should you check after the light comes on?
Walk the route at a normal pace, then repeat it with a pause at the edge of the detection area. Note whether the light goes out while you are still on the route and whether moving again switches it back on. In a separate run, leave the area and record how long the light stays on after the last movement. That is a different measurement from the delay between approaching and the light coming on.
Repeat the same approach in daytime and under the hotel's intended night lighting. Record what happens rather than assuming the fitting has a daylight sensor or an adjustable delay. If the project calls for the lights to stay off in daylight, ask the supplier to confirm that function for the exact version before approving the sample.
What if the whole flight needs to light together?
Test the actual linked configuration, not one lamp on its own. Mark which fittings should turn on together, then approach from each normal entry point. Record which fittings come on, whether the intended group switches off together, and what happens when someone approaches again while the group is still on. If only one fitting is available to test, record group behaviour as pending.
A quotation may list figures such as 1–3 m detection, a 120° detection angle or a 30-second hold time with a ±10% tolerance. Confirm which figures apply to the exact sample and whether they also apply to the linked version. Use the installed test to check whether that configuration meets the project's requirements. Also check what each angle refers to: the 90° figure on the DAYBREAK 1W indoor PIR step light describes its downward light beam, not its detection angle.
What should go into the sample approval and order?
Keep the marked stair drawing, the exact model and faceplate, and a short record of where each approach triggered the light. Add the observed hold time, daytime behaviour and linked group, where applicable. Note any unresolved result. If the supplier proposes a different sensor or faceplate for production, ask which checks need to be repeated before releasing the bulk order.
Ready to request a sample? Send DAYBREAK your stair plan with the proposed mounting height, the earliest and latest points at which you want the lights to come on, and the fittings that should light together. Include the project quantity and destination country if you also need a quotation. A marked-up phone photo of the drawing is enough to start the discussion.
Frequently Asked Questions
Can I approve PIR step lights from the quoted detection range alone?
No. Use the quoted range to shortlist a fitting, then test whether it lights before your marked point on each approach. A straight approach and a turn onto a stair flight are not the same test.
How can I tell whether a step light has a daylight function?
Test the same route under bright and dim conditions and ask the supplier to confirm the function for that model. If daylight operation matters to the order, record the required behaviour in the sample approval.
Can one sample prove that linked step lights will work as a group?
One sample can show how that fitting triggers. To approve linked operation, test the intended sensor and connected fittings together and confirm which lights switch on and off from each entry point.