How Should Buyers Organise a Multi-Model LED Wall Light Project Order?
Ordering several LED wall light models? Use one fixture schedule to control specifications, sample approvals, and quantities before requesting a PI.

One fixture schedule controls a multi-model wall light order. When a project specifies four wall light types across three buildings, the risk is not the fixtures — it is that each model drifts in specification, finish or approval status. A single schedule, one approval reference per model and one order version removes that risk.
Key facts about multi-model wall light orders
- One schedule, not per-model emails — every model on the same document.
- One approved sample per model, referenced by number.
- Finish and CCT must be identical across models in a visible area.
- Carton quantities differ per model — the order must state each separately.
- One order version — changes go into a new version, not a thread.
What should the schedule include?
| Column | Why |
|---|---|
| Model number | Unambiguous identification |
| Location / building / floor | Where each model goes |
| Quantity by location | Prevents over- or under-supply |
| Wattage | Affects output and driver |
| CCT and binning | Colour consistency |
| Finish code | Match to the approved sample |
| Beam pattern | Effect on the wall |
| IP rating | Location-dependent |
| Mounting height | Drives pattern and spacing |
| Sample reference | Links the order to the approved unit |
A schedule that omits locations produces quantities that cannot be checked against the drawings later.
How should samples be approved?
- Approve one sample per model, not one sample for the whole project.
- Record the sample serial number or approval date against the model.
- Photograph each sample under the same lighting and white balance.
- Confirm the finish and CCT match across all models before approval.
- Keep one approved sample per model until bulk delivery is accepted.
Approving one model and assuming the others match is the most common cause of a colour or finish complaint on a multi-model order.
What should be checked before the PI?
| Check | Why |
|---|---|
| Quantity per model matches the schedule | Avoids short or over shipment |
| Finish code identical across models | Visual consistency |
| CCT and binning identical | Colour consistency |
| Driver and dimming protocol per model | Control compatibility |
| Carton quantity per model | Warehouse and site handling |
| Sample reference per model | Bulk must match the approved unit |
| Lead time per model | Phased delivery planning |
Why does one order reference matter?
Multi-model orders drift because each model is discussed separately. The finish changes for one model, the CCT changes for another, and by production the "set" no longer matches. A single order reference with a version number keeps the models bound together.
- One document with every model
- One version number, updated on any change
- One approval signature per version
- One lead-time statement covering all models
How should phased delivery be planned?
Where buildings are handed over in phases, the order should state which models ship in which phase. Mixing phases in one shipment creates site storage problems; splitting without a plan creates gaps.
| Phase | What to confirm |
|---|---|
| Phase 1 | Models and quantities for the first handover |
| Phase 2 | Remaining quantities, same finish and batch where possible |
| Spares | Held from the same batch as each phase |
Where phases are separated by months, confirm that finish and CCT can be repeated from the same specification — a new production batch may differ slightly.
Which models are commonly specified together?
The LED wall light range covers models that can be supplied in a matched finish and CCT across a project. Frequently specified as a set:
- DB-LWL-A06AIP65 — 6W/12W IP65 adjustable, for facades and entrances.
- DB-LWL-A03A — 6W/12W IP44 square, for covered corridors.
- DB-LWL-A10 — slim surface-mounted, for hotel corridors and feature walls.
Minimum order is 10 pcs per model. Send the full schedule and we will confirm the model set, finish consistency and lead time together.
Frequently asked questions
Can different models be supplied in the same finish?
Yes, if all models are specified with the same finish code in one order. Confirm this before quoting, because not every finish is available on every model.
Do I need a separate sample for each model?
Yes. One sample cannot confirm the finish and CCT match across a set.
What if one model is delayed?
The schedule should state lead time per model so partial delivery can be planned. A single overall lead time hides the risk.
How should spares be ordered?
Per model, from the same production batch, at 2–5% of quantity for visible runs.
Can quantities be adjusted after the PI?
Usually only before production starts. Once materials are cut and the batch is running, quantity changes are costly.